UBPS4504FS1L

Clamping element
Series UBPS
- broad range of products
 For all common profile rail guides
- Energize to open (NC)
 through spring-loaded energy storage
- high durability
 Up to 5 million static clamping cycles
- Higher holding force
 Via activation with PLUS air
- Safety element
 Safe braking in case of energy failure
Equipment/Options
 PLUS connection PLUS connection
              Matching rail / wagon combinations
            
| Rail manufacturer | Rail type | Rail size | Carriage type | |
|---|---|---|---|---|
| NSK | RA(R1A) | 45 | RAA..AL | show variant | 
| NSK | RA(R1A) | 45 | RAA..BL | show variant | 
| NSK | RA(R1A) | 45 | RAA..EM | show variant | 
| NSK | RA(R1A) | 45 | RAA..GM | show variant | 
| NSK | RA(R1A) | 45 | RAA..AN | show variant | 
| NSK | RA(R1A) | 45 | RAA..BN | show variant | 
              Technical Data
            
| Operation | pneumatic | 
| Holding force | 5200 [N] | 
| Theoretical holding force (µ=0,1) | 6500 [N] | 
| PLUS connection possible | Yes | 
| Holding force PLUS connection | 7600 [N] | 
| Operating pressure | 5.5 ... 6.5 [bar] | 
| Nominal operating pressure | 6 [bar] | 
| B10d value | 5000000 | 
| Positioning accuracy +/- | 0,02 [mm] | 
| Opening time | 0.31 [s] | 
| Closing time | 0.03 [s] | 
| Operating temperature | -10 ... +70 [°C] | 
| Approvals | CE / UKCA / LABS / REACH / RoHS | 
| Weight | 6.2 [kg] | 
| Function | Clamping and braking | 
| Condition | NC (Normally Closed) closed without pressure | 
| Installation direction | from the front | 
| Air volume per cycle | 50 [cm³] | 
| max. length clamping | 197 | 
              Benefits in detail
            

- Profile rail guide
 Available for all common profile rail guides
- Wedge-type gear
 Power transmission between the pistons and clamping jaws and brake shoes
- Clamping jaws and brake shoes
 Pressed at the free surfaces of the profile rail guide
- Housing
- Pneumatic piston
 The piston moves the wedge-type gear longitudinally
- Spring-loaded energy storage
 For non-pressurized closing of the clamping unit
- Scraper
 Can also be ordered as an option
- Integrated valve (optional)
 Up to 60% faster closing time regardless of the cable length
